Jackhammer – Procedure

Use this checklist to ensure thorough safety and maintenance procedures before jackhammer use.

Detailed Inspection Procedures

Follow these structured procedures to ensure a thorough inspection of your jackhammer. Adapt these steps to your specific equipment model and operating conditions.

Pneumatic Jackhammer Inspection

  1. Disconnect from air supply and release pressure
  2. Inspect air hose for cuts, cracks, and abrasions
  3. Check quick-connect fittings for security and damage
  4. Ensure proper oil level in inline lubricator if equipped
  5. Verify air filter is clean and moisture trap is emptied

Electric Jackhammer Inspection

  1. Unplug tool before inspection
  2. Inspect entire length of power cord for damage
  3. Check plug for bent prongs or damage
  4. Verify GFCI protection is operational
  5. Ensure ventilation slots are clear of debris

Tool Bit Inspection

  1. Remove bit from jackhammer
  2. Check for mushrooming or deformation at striking end
  3. Look for cracks, especially near the collar
  4. Verify shank is not worn down or damaged
  5. Ensure bit is appropriate for the job and machine

Anti-Vibration System Check

  1. Inspect handle mounting points for security
  2. Check all rubber dampers for cracks or deterioration
  3. Verify spring isolators (if present) are intact
  4. Ensure grip material is not worn through
  5. Test handles for excessive movement or play
Use Checklist Online